Skip to content
Product · Production

Work orders, from BOM to finished goods

Bills of materials, a full work-order lifecycle - release, material issue, finished-goods receipt, completion - and MRP netting against current stock.

Beta BOMs, work orders and MRP netting exist and are in beta; the visual, stage-by-stage shop-floor board is still on the roadmap.

Built for these teams

Production teamsOwners & executivesInventory & warehouse teamsImplementation partners

What you can do today

Every capability below is labelled with its real availability status - we don't describe planned work as shipped.

  • Bills of materials

    Create and maintain BOMs, including CSV import/export, independent of the Design Engine's configuration foundation.

    Beta
  • Work order lifecycle

    Create a work order and move it through release, material issue, finished-goods receipt, completion or cancellation.

    Beta
  • MRP netting

    Net material requirements against current stock to see what a work order still needs.

    Beta
  • Stage-wise shop-floor board

    A visual, stage-by-stage view of every job on the floor (cutting, edge-banding, assembly, finishing, dispatch).

    Planned
  • Worker assignment & load view

    Assigning jobs to specific workers and seeing floor load in real time.

    Planned
Order to finished goods

A work order that knows what it needs

A work order is built from a bill of materials, checked against current stock through MRP netting, and moves through release, material issue and finished-goods receipt to completion - with every transition recorded.

  • BOM-driven work orders
  • MRP netting against live stock
  • Full lifecycle: release → issue → receive → complete

How access and records are governed

Role-based permissions and an append-only audit trail apply across every module - see the Security & Compliance page for the full model.

  • Role-based permission scoping

    BOM and work-order actions (create, release, complete, cancel) are individually permissioned.

    Available
  • Append-only audit trail

    Work-order lifecycle transitions and BOM changes write to the platform audit log with actor and before/after state.

    Available

What it takes to turn this on

  • Confirm your item master and units of measure in Inventory before building BOMs.
  • Treat this module as beta - pilot it on a subset of orders before relying on it for your full production schedule.
  • Talk to us if a visual shop-floor board or worker assignment is a requirement for your go-live - that's not shipped yet.
  • Assign work-order release/completion permissions to your production leads separately from general staff.

Frequently asked

Is Production ready to run our whole shop floor today?

The BOM, work-order and MRP-netting backend is real and in beta. The visual stage-by-stage floor board and worker-assignment view referenced on our Features and Solutions pages are still on the roadmap - talk to us about your specific process before committing a go-live date.

Does a work order check stock before it starts?

Yes - MRP netting compares a work order's material requirements against current stock so shortages are visible before you release it.

Can a work order be cancelled part-way through?

Yes - the lifecycle supports cancellation alongside release, material issue, finished-goods receipt and completion.

Woodworking ERP · Job cardJOB No. ____Your job next

Talk to us about your shop floor

We'll be direct about what's ready to pilot versus what's still on the roadmap for your process.

Prepared byYou, with one real job
Walked through byThe Woodworking ERP team