Skip to content
All articles
Production · · Propulsive Team

How to cost edge banding properly (and stop losing money on every panel)

Edge banding looks cheap per metre, so it is easy to under-price. A simple way to cost it per edge: tape, waste, glue and machine time.

Edge banding rarely gets the attention board does. A sheet of laminated board is an obvious cost; a roll of tape is not. But across a kitchen or a run of wardrobes, banding adds up to hundreds of running metres, and small pricing gaps repeat on every panel.

Cost it per edge, not per job

The most common mistake is adding a lump sum for "edging" at the end of a quote. That number never matches what the job uses. Instead, cost banding from the parts themselves:

  1. List every banded edge. A shelf may be banded on the front only; a visible end panel on three or four edges. The cut list already knows which edges are banded, so use it.
  2. Add up running metres per tape type. A 0.8 mm tape on carcass edges and a 2 mm matching tape on visible fronts are different materials with different prices.
  3. Price each tape type separately. One "edging" line hides the expensive tape inside the cheap one.

Add the allowances people forget

Running metres alone under-state real use. Every edge needs a little extra:

  • Overhang and trim. Machines and hand-banding both need a short overhang at each end of an edge that is trimmed off. On small parts this can be a large share of the tape used.
  • Roll ends and set-up. The tail of a roll, test pieces after a colour change and re-banded rejects are all real consumption.
  • Glue. Hot-melt glue is consumed per metre. It is a small number, but it belongs in the cost.

A practical approach is to set an allowance per edge (for trim) and a percentage on top (for roll ends and rejects), then check both against what your store actually issues each month. Adjust them when the numbers drift.

Do not forget machine and labour time

Banding time is driven by the number of edges and their length, not by the board area. Twenty small drawer parts take far longer to band than two large side panels with the same total area. If your labour estimate is based on square metres, small-part-heavy jobs will be under-priced.

Count edges as well as metres, and use both when you estimate time.

A worked example (illustrative numbers)

Say a base unit has 6 banded edges totalling 4.2 running metres of 2 mm tape. With a trim allowance of 50 mm per edge (0.3 m in total) and 8% for roll ends and rejects, tape used is (4.2 + 0.3) × 1.08 ≈ 4.9 m. Multiply by your tape price per metre, add glue per metre, and add time for 6 edges, not just 4.2 metres. The difference from "4.2 m of tape" is small on one unit and large on a forty-unit job.

Make it automatic

All of this is arithmetic that should not be redone by hand for every quote. When the edge banding on each part is recorded once, in the design or cut list, the running metres per tape type, the allowances and the edge count can be calculated the same way every time — and the same figures can drive the purchase order for tape, so the store orders what production will actually use.

The goal is simple: the price on the quote and the tape on the shop floor should come from the same numbers.

Woodworking ERP

Woodworking ERP Updates

Approved releases, implementation guidance, manufacturing education, training and events.

  • Choose only the topics and frequency you want.
  • Confirm ownership of your email before any newsletter is eligible for delivery.
  • Change preferences or unsubscribe through the private link in every message.
Topics
Woodworking ERP · Job cardJOB No. ____Your job next

See Propulsive on your own shop floor

A guided demo on your products, your process - then start on a paid plan, no free trial.

Prepared byYou, with one real job
Walked through byThe Woodworking ERP team